The same control flow is captured in Figure 7 using activity form.
图7采用活动形式捕获相同的控制流。
You can use gateway form and activity form interchangeably for process models that contain only control flow, as we discussed in the Background section in Part 1 of this article.
流程模型中的网关形式和活动形式可以互换使用,如本文第1部分中的背景部分所述。
Control logs automatically record all computer network activity on magnetic disk or tape devices and are a form of an electronic audit trail.
控制日志自动记录所有的电脑网络活动,对磁盘或磁带设备,并是一种形式的电子审计线索。
应用推荐